#Installation of Open #Belt #Conveyor #Cover

View 1: Installation drawing of whole open –close type 

whole open-close conveyor cover drawings

 
View 2: Installation drawing of half open –close type (double chip open- close type) 
half-open-close-conveyor-cover-drawings



 
1) installation of handle 
After overlapping the open cover and fixed cover, based on the center line of the cover, the location upward 250mm is the center line used for installing the handle (it can be adjustable according to height of the conveyor support frame). Put the handle straightly and drilling a 4-Φ5 hole, then fasten with the rivets.

2) installation of hinge 
Adjust one side of the cover up higher from the top of the Z type steel (angle iron) 5mm, inward 140mm from the front and back sides of the cover, and upward 27mm is the location of the hinge, then drill holes Φ5 and fasten with the rivet. Others holes are also fastened with the rivets. 

3) installation of the lock catch
After installing the hinge, on the other side of the cover, inward 185mm from front and back sides of the cover, then based on the bottom, upward 36mm and 77mm , drill holes Φ5 and fasten the lock with the rivet, next keeping the lock locking( clamp status), and then putting the lock nose on the Z type steel straightly and drilling hole to fasten.

4) installation of the open cover
Overlap the open cover on the bilateral fixed covers. The overlapped length should be the length of 2 pitches of waves, then put the other side of the hinge appressed on the angle iron and drill hole 4-Φ5 with the rivet fastened.

2015年8月21日星期五

How to Install Belt Conveyor Cover Support Frame?

 Belt conveyor cover is applicable to power plant, cement plant, mines and other major factories which is waterproof, dustproof and windproof, it plays a great role in reducing the loss during the process of conveying goods ,making the conveyor belt more safe and reliable in operation and purifying the environment .

As the main support frame of the conveyor cover, the length of Z type steel or the connection angle iron is equal to the length of the installed conveyor cover. Please weld the Z type steel or the connection angle iron on the channel steel or the little stiffening angle iron on both sides of the belt conveyor. If need the stiffening angle iron, at first, weld the stiffening angle iron on both sides of the conveyor, then weld the Z type steel or the connection angle iron on the stiffening angle iron, detailed steps are as following:
 1) first weld the little stiffening angle iron ∟40*40*100*4(just for reference, it also can be indicated by users) every 1.5m or 2 m on both sides of the belt conveyor ( eudipleural ). The height from the intermediate frame to the top of little stiffening angle iron should ≥50mm ( it also can be decided by users).
2) Then weld the Z type steel 30*50*30*(2.0~3.0),( just for reference, it also can be replace by angle iron) and fix it on both sides of the intermediate frame top, the inner size should be 10-20mm bigger than outside size of intermediate frame.
3) After being welded please remove welding slag then paint.
Henan Pingyuan Mining Machinery Co., Ltd is the most professional manufacturer of Belt conveyor, and Vibrating screenBucket elevatorScrew conveyorScraper conveyor using the world's most advanced technology, we are willing to serve every company to meet your custom needs. our goal is "be the future global leader of mining machinery industry". have any questions, please contact us without any hesitation. 

  •            Tel: +86 373 579 9198
  • Fax: +86 373 507 1699
  • Address: 289 Yellow River Road, Xinxiang City, Henan Province, China

2015年8月1日星期六

Overhaul and Maintenance Method for Large Inclination Corrugated Sidewall Conveyor Belts

Transporting bulk materials, corrugated sidewall conveyor belts provide high-quality long-term high-incline conveyance solutions. Large inclination corrugated sidewall belt conveyors applies to large scale open-pit mines, power plants, cement plants and ports, with the characteristics of large conveying capacity, low energy consumption and convenient maintenance, it becomes a powerful machine. However, during the process of operation, there will be belt failure due to improper use which can lead to skirt and belt tear or fall off, beltsreplacing will increase the production cost, in order to reduce the production cost, it is necessary to study and explore the large inclination corrugated sidewall belt conveyors repairing process points.
添加图片说明
Non-load running for 2 hours after installation to check whether there is belt cracking or falling off or not, if any problems please handle timely; Initially, please feed the material as per 50% of design capacity, after running for a period of time and confirming the operation is correct, you can feed material as per design capacity ; If material accumulation is found during operation, please stop running to avoid skirt or belt falling off.
Large inclination corrugated sidewall conveyor belts crack or fall off, you need to pay attention to the following points when repairing: 
1. Clean up the site environmental, and keep the skirt and belt clean.
2. Roughening and cleaning up the belt and skirt connection parts evenly by polishing machine, uneven layer or surface is not allowed to appear.
添加图片说明
Henan Pingyuan Mining Machinery Co., Ltd is the most professional manufacturer of Belt conveyor, and Vibrating screenBucket elevatorScrew conveyorScraper conveyor using the world's most advanced technology, we are willing to serve every company to meet your custom needs. our goal is "be the future global leader of mining machinery industry". have any questions, please contact us without any hesitation.
 skype:wang.betty13
E-mail:kewang808@gmail.com